All about flooble | fun stuff | Get a free chatterbox | Free JavaScript | Avatars    
perplexus dot info

Home > Shapes
Tilting Tower (Posted on 2024-02-14) Difficulty: 3 of 5
In a large level rectangular field a tall wooden tower was built for training parachute jumpers. The tower is in the shape of a truncated rectangular pyramid. That is, the base is a rectangle, and the top is a smaller rectangle parallel to the base. The longer sides of the field, the base of the tower and the top of the tower are all oriented east to west.

After several years of use, a strong gale tilted the tower, so that the western edge of the top was higher than the eastern edge. (The top was still a rectangle with its eastern and western edges parallel to the eastern and western edges of the field.) The engineers determined that the tower was still fit for use, but to prevent further tilting they stretched cables tightly from the corners of the field to the nearest corners of the top of the tower. The lengths of these cables, going clockwise are 95, 109, 125, and X meters.

What is X?

See The Solution Submitted by K Sengupta    
Rating: 5.0000 (2 votes)

Comments: ( Back to comment list | You must be logged in to post comments.)
No Subject | Comment 4 of 6 |
网课代修任务的执行和进度跟踪是整个服务流程的核心环节。专业的网课代修机构通常会为每位学生指定一位或多位具有相关专业背景和经验的代修人员,负责具体的课程作业和考试任务。在任务执行过程中,学生应与代修人员保持密切的沟通,定期了解任务进展情况,并提供必要的反馈和建议。代修机构通常会通过邮件、在线平台或专门的沟通工具,与学生保持联系,确保信息传递的及时性和准确性。此外,代修机构还会定期向学生提供任务进度报告,详细说明已完成的作业和考试情况,以及接下来的计划。通过持续的沟通和进度跟踪,学生可以随时了解代修任务的具体情况,确保所有任务按时高质量完成。

  Posted by meeloun education on 2024-06-20 01:09:09
Please log in:
Login:
Password:
Remember me:
Sign up! | Forgot password


Search:
Search body:
Forums (0)
Newest Problems
Random Problem
FAQ | About This Site
Site Statistics
New Comments (3)
Unsolved Problems
Top Rated Problems
This month's top
Most Commented On

Chatterbox:
Copyright © 2002 - 2024 by Animus Pactum Consulting. All rights reserved. Privacy Information