All about flooble | fun stuff | Get a free chatterbox | Free JavaScript | Avatars    
perplexus dot info

Home > General
The Chain (Posted on 2024-01-07) Difficulty: 3 of 5
A blacksmith has 10 scrap pieces of chain that he wants to join together to make a whole chain. It takes time to open and reweld a link, so he wants to do this as few times as possible. The number of links in the scraps are 2, 3, 4, 6, 8, 9, 12, 13, 15 and 19.

What is the most efficient way for him to join all the pieces?

See The Solution Submitted by K Sengupta    
Rating: 5.0000 (1 votes)

Comments: ( Back to comment list | You must be logged in to post comments.)
代写留学生论文平台的优势 | Comment 2 of 3 |
代写留学生论文平台平台提供的作品在形式上也非常丰富多样。无论是论文代写、研究报告代写、案例分析还是演讲稿,都可以找到相应的服务。这些作业不仅内容准确且独具一格,还有助于留学生培养自己的思辨能力和独立研究能力。
  Posted by neiljiohu on 2024-02-05 23:42:07
Please log in:
Login:
Password:
Remember me:
Sign up! | Forgot password


Search:
Search body:
Forums (0)
Newest Problems
Random Problem
FAQ | About This Site
Site Statistics
New Comments (3)
Unsolved Problems
Top Rated Problems
This month's top
Most Commented On

Chatterbox:
Copyright © 2002 - 2024 by Animus Pactum Consulting. All rights reserved. Privacy Information